Three edits closing concessies surfaced in chat review of the closure
docs-PR:
1. FORM-05 'Resterend werk' sub-paragraph: surgical replacement of
resolveStatus references (method removed in D2, PR #1123a5696).
Updated to describe post-D2 reality: gate + invariant +
handle()-internal status derivation. Ticket stays open (the
detectMatchesByValues extension is unbuilt).
2. FRONTEND-ECHO-IDENTITY-MATCH-SUBSCRIPTION (NEW): tracks the frontend
follow-up where the portal IdentityMatchBanner subscribes to the
submission.{id} channel for live banner updates. Previously
documented in PR #11 body and RFC §Q1 v1.3 add 2 commentary but
without an actionable BACKLOG ticket.
3. HARD-DEADLINE-QUERY-TIMEOUT (NEW): tracks the upgrade from soft
post-call microtime deadline to a hard deadline that can interrupt
hanging MySQL queries (connection-level timeouts, MAX_EXECUTION_TIME
hints, or pcntl_alarm). Previously documented as 'soft deadline
limitation' inline in code comments without an actionable BACKLOG
ticket.
No spec changes; no code changes. Closes the chat-identified gaps so
WS-6 v1.3-delta closure has zero un-anchored mental TODOs.
Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>